Project Handoff Form
New Handoff
My Drafts
Save Draft
01
Project Identity
Enter the Job Number and click "Load from JobTread" to pull in what's already on file, then fill in the rest. Every field stays editable — treat pulled-in data as a starting point, not gospel.
Job Number
Load from JobTread
Job Name
Client Name
Client Phone
Client Email
Client Mailing Address
Job Site Address
Assigned PM
Project Developer
Projected Start Date by Rep
Select...
1 to 2 weeks
3 to 4 weeks
2 to 3 months
3 to 4 months
4 months plus
Secondary Contact (if applicable — e.g. spouse or co-buyer)
Name
Phone
Email
02
Client Profile & Promises Made
Everything said to the client that is NOT in the contract. The PM must know this before their first client interaction.
Primary Decision-Maker (if not contract signer)
Specific Promises or Commitments Made
Promise / Commitment
Known Client Sensitivities
Concerns raised during sales (noise, access hours, landscaping, pets, HOA, etc.)
Design Decisions Still Open
Open Item 1
Open Item 2
Open Item 3
Open Item 4
Open Item 5
Open Item 6
03
Scope Summary
Write what the crew and PM need to understand on day one — not the contract legal text.
Permitting
Permitted
Non-Permitted
Primary Structure Type(s)
Complete tear down of existing
Partial demolition
New composite deck
Re-deck
New screened porch
Remodel porch
Hardscaping
Pergola / Shade structure
Other Structure / Notes
Plain-Language Scope Summary
04
Material Selections
Describe any non-standard or out of the ordinary finishes here. Describe anything that is atypical from PDP normal build specs.
Non-Standard or Custom Selections
Deviation 1 — describe what it is and why it was selected
Deviation 2
05
Job Access and Site Conditions
Used to brief both the PM and drafter. Be specific — vague entries create field errors.
Access & Site Constraints
Equipment access route
Underground utilities, septic, or irrigation in work zone
Landscaping, hardscape, or structures to protect
Pet Consideration
Select...
Yes
None
Not sure
Ask homeowner
06
Structural & Engineering Notes
These details drive the drafter's permit drawings. Complete every field for every job.
Site Plan / Survey
Is the site plan or property survey being supplied by the client?
Select...
Yes
No
Has a site plan or property survey been included in job budget?
Select...
Yes
No
Where is the client supplied site plan or survey currently located?
Select...
JobTread
My Email
Job Folder on SharePoint
Other
Grade & Elevation
Finished Deck Height off Grade at House
Max Height at Any Corner
Describe slope direction and severity
Grade is relatively flat
Significant slope — drafter must account for variable post heights
Grade change creates multi-level requirement
House Attachment
Ledger to rim joist
Ledger to masonry / brick
Freestanding — no ledger
TJI's (Blocking Required)
Non-standard — describe below
Flashing Details / Attachment Notes
Load Conditions
Standard residential (40 psf)
Hot tub / spa on structure
Outdoor kitchen or heavy feature
Engineering stamp required
Framing Layout
Joist Spacing
Select...
10 inches on center
12 inches on center
16 inches on center
Engineered Beams
Deviations from PDP Standard Framing Spec
Standard spec — no deviations
Deviation 1
Deviation 2
07
Permit & HOA
Permit Status
Select...
Not yet applied
Application submitted
Approved
Not required
Jurisdiction / City / County
HOA Approval Required
Select...
Yes
No
Unknown
HOA Approval Status
Select...
Not started
Submitted — pending
Approved
N/A
Known permit complications or jurisdiction-specific requirements
08
Subcontractor & Trade Flags
Flag any trade work discussed with the client or implied by the scope, even if not explicit in the contract.
Check off all required trade partners for this project.
Electrical (lighting, outlets, fans)
Concrete / flatwork
Plumbing (outdoor kitchen, wet bar)
Motorized screen system
Louvered roof system
Pavers or retaining walls
Aluminum under deck
HVAC
Gutters
Roofing
Siding
Is the homeowner using any of their own subcontractors?
Select...
Yes
No
If yes, describe
Other Trades / Coordination Notes — Any trades need extra lead time?
Are there any other out-of-the-ordinary trade circumstances the project manager needs to know about?
09
Handoff Certification
By submitting this form, you confirm this information is complete and accurate, all photos are uploaded and labeled in JobTread, and the PM has been notified this package is ready.
Salesperson Name (confirm)
Date of Submission
PM Notes / Open Questions for Handoff Meeting
Ready to submit?
This will generate a branded PDF and download it to your device. Make sure all sections are complete before submitting.
Generate & Download PDF
✅
Form Submitted
The handoff PDF has been generated.
Close
In-Progress Handoffs
Close