Peachtree Decks & Porches Project Handoff Form
01 Project Identity
Green-highlighted fields are pulled from the approved JobTread contract. All other fields require manual entry by the salesperson.
01b Contract Line Items
Cost items pulled from the approved Contract document in JobTread. Review for accuracy.
# Item Qty Unit Price Total
No line items loaded — enter a job number above
02 Client Profile & Promises Made
Everything said to the client that is NOT in the contract. The PM must know this before their first client interaction.
Communication Preferences
Specific Promises or Commitments Made
Known Client Sensitivities
Design Decisions Still Open
03 Scope Summary
Write what the crew and PM need to understand on day one — not the contract legal text.
Primary Structure Type(s)
04 Material Selections
Exact product selections required. Vague entries ("Trex, brown") are not acceptable. Include manufacturer, product line, color name, and SKU where known.
Decking
Railing
Fasteners
Non-Standard or Custom Selections
05 Site Conditions
Used to brief both the PM and drafter. Be specific — vague entries create field errors.
Grade & Elevation
House Attachment
Access & Site Constraints
Photos
All site photos must be uploaded to the JobTread job file and labeled before submitting this form. Label format: "North elevation," "Grade from left corner," "Ledger location," etc.
06 Structural & Engineering Notes
These details drive the drafter's permit drawings. Complete every field for every job.
Framing Layout
Load Conditions
Deviations from PDP Standard Framing Spec
07 Permit & HOA
08 Subcontractor & Trade Flags
Flag any trade work discussed with the client or implied by the scope, even if not explicit in the contract.
09 Handoff Certification
By submitting this form, you confirm this information is complete and accurate, all photos are uploaded and labeled in JobTread, and the PM has been notified this package is ready.
Ready to submit? This will generate a branded PDF and download it to your device. Make sure a job has been loaded above and all sections are complete before submitting.